Back to the Floor Launch case study
Release line

How a change reaches production

A fleet of coding agents merges into Floor Launch all day. Production does not move with them. Every merge lands on staging first and runs 141 checks there. Production moves when Promote runs, around 9pm ET every night or when the owner presses it, and Promote ships exactly the build staging passed. An expedite lane exists for emergencies. After each release, production is checked and then watched for an hour, and the app rolls itself back if errors spike.

13 of 13finished merges passed staging in this replay
4 of 4watched releases clean in this replay
0rollbacks or holds in this replay
9:15pmfirst Promote that ran by itself

The architecture

Before mergeGitHub Actions on Blacksmith runners
Stagingits own database
Productionthe live app and database
Always onRuns on its own schedule, beside every change.
A change moves this wayOnly when a release failsRaises an alarm

The chips on the boxes show the state at the end of the replay below, Wed, Oct 28, 9:37pm ET.

Promotepromote.yml

Promote reads which build staging serves and whether it passed. If it did, Promote releases exactly that build. If it did not, the run ends green and says why. The 9pm run skips freeze dates and an unfinished release. Only the owner may press it by hand, any time.

Replay: merge by merge, release by release

Wed, Oct 28, 9:37pm ETEnd of replay

Staging

its own databaseserves #3914 5273308
Merged0

Reaches staging in about 5 minutes.

Checks1

141 checks, about 7 minutes.

Waiting0

Passed. Waits for the next Promote.

PromoteOpen. Ran itself at 9:15pm.

Production

the live appserves #3911 987020f
Shipping0

Migrations, the app, checks.

Watching3

Already serving. 60 minutes on production's errors.

Released10

Watch clean, release recorded.

  1. #3914 merged. The nightly balance check stops flagging a difference QuickBooks explains itself.
  2. Production checks passed. Watching production's errors for 60 minutes.
  3. The app reached production, which now serves 987020f.
  4. Promote ran by itself for the first time. Shipping #3912, #3913 and #3911.
Tue 12pmTue 6pmWed 12amWed 6amWed 12pmWed 6pmMergesReleases#3900#3891#3902#3898#3904#3883#3887#3906#3908#3910#3912#3913#3911#39142:48pmto #39009:05pmto #39047:34amto #39063:24pmto #39109:15pmto #3911end

Drag across the timeline to move the line to any moment. On a small screen the timeline scrolls sideways as the line moves. Solid bars are a release shipping, the paler part is its 60-minute watch.

The replay is real data: merge and release times from 27 to 28 Oct 2026, with every title rewritten in general terms. Times are New York time.